EVALUASI PENGGUNAAN ALAT MODIFIKASI PLUG UNTUK MENGURANGI NON-PRODUCTIVE TIME (NPT) DALAM PROSES UJI TEKANAN TUBING PADA PEKERJAAN PRE-FRACTURING

Categorie(s):
   TA, 2024
Author(s):
   M. Abdullah Marisi, 2001163
Advisor:
Baiq Maulinda Ulfah, S.T., M.T. & Deny Fatryanto E., S.T., M.T.
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):

DOI:
Abstract :