PERENCANAAN SQUEEZE CEMENTING TERHADAP SUMUR DENGAN WATER CUT TINGGI MENGGUNAKAN BALANCE PLUG METHODPADA SUMUR X DI LAPANGAN Y

Categorie(s):
   TP, 2023
Author(s):
   Mahadetya, 1901274
Advisor:
Dr.Sulardi,ST.,MT.,MM
Teddy Kurniawan,S.Si,M.Sc
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):

DOI:
Abstract :