PENENTUAN LETAK KEDALAMAN SURFACE SAMPAI INTERMEDIATE CASING PADA SUMUR "X" DI LAPANGAN "Y"

Categorie(s):
   TP
Author(s):
   RANDI ANDHIKA
Advisor:
YUDIARYONO, M. NUR MUKMIN
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
TEKANAN PORI, TEKANAN REKAH, EMW, DRILLING RATE, INTERMEDIATE CASING
DOI:
Abstract :