PERHITUNGAN PENANGGULANGAN WELL KICK PADA PEMBORAN SUMUR "XY" LAPANGAN "ZY" DENGAN METODE DRILLER DAN PERBANDINGANNYA TERHADAP DATA AKTUAL.
Categorie(s):
TI, 2022
Author(s):
YOPAN PAKENDEK, 1801177
Advisor:
Markus Lumbaa, S.T.,M.T , M Nur Mukmin, S.T.,M.T
ISSN/ISBN:
eISSN/eISBN:
Keyword(s):
PERHITUNGAN PENANGGULANGAN WELL KICK PADA PEMBORAN SUMUR "XY" LAPANGAN "ZY" , METODE DRILLER
DOI:
Abstract :