ANALISA BEBAN KERJA PADA PLANNING OVERHAUL TANGKI PADA SECTION EQUIPMENT OVERHAUL-TA DENGAN MENGGUNAKAN METODE FULL TIME EQUIVALENT DI PT. PERTAMINA RU V BALIKPAPAN KALIMANTAN TIMUR

Categorie(s):
   TI, 2018
Author(s):
   AHMAD NABAWI, 1301217
Advisor:
MARKUS LUMBA, ST., MT
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):

DOI:
Abstract :