ANALISIS PRESSURE BUILD UP TEST PADA SUMUR XYZ MENGGUNAKAN METODE HORNER PLOT DAN SIMULATOR WELLTEST DI PT MA

Categorie(s):
   TP, 2020
Author(s):
   MUHAMMAD ADI K, 1401023
Advisor:
Eltimeyansi Cresye Randanan, ST., M.Si
Ir. Andry Halim, MM
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
WELL TESTING, PRESSURE BUILDUP, HORNER
DOI:
Abstract :