OPTIMASI RATE PRODUKSI SUMUR "RZQ" LAPANGAN "CLEO" MENGGUNAKAN METODE PERMANENT COILED TUBING GAS LIFT DENGAN SOFTWERE PRESPER
Categorie(s):
TP, 2020
Author(s):
RIZQI AZJWAR ASWWAD, 1401136
Advisor:
Ir. Yudiaryono, MT
M. Nur Mukmin, ST., MT
M. Nur Mukmin, ST., MT
ISSN/ISBN:
eISSN/eISBN:
Keyword(s):
COILED TUBING, PCTGL, GAS INJECTION, KICK OFF INJECTION, MAXIMUM OF DEPTH INJECTION
DOI:
Abstract :