OPTIMASI PERFORMAN SUMUR MINYAK DAN GAS BUMI DENGAN MEMANFAATKAN PERMANENT COILED TUBING GAS LIFT (PTCGL) MENGGUNAKAN INTERGRATED PRODUCTION MODELLING PROSPER

Categorie(s):
   TP, 2020
Author(s):
   ISMAIL, 1401119
Advisor:
Andi Jumardi, ST., MT
Irfan Hidayat, ST., M.Si
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
COILED TUBING, PCTGL, GAS INJECTION, KICK OFF INJECTION
DOI:
Abstract :