OPTIMASI PRODUKSI MINYAK PADA SUMUR KK-26 MENGGUNAKAN METODE ARTIFICIAL LIFT PERMANENT COILED TUBING GAS LIFT DENGAN BANTUAN SIMULATOR PROSPER

Categorie(s):
   TP 2019
Author(s):
   KHUSNUL KHULUQ, 1401238
Advisor:
Dr.Ir.CHARLES PANGARIBUAN, DEA .,CES
ROHIMA SERA AFIFAH,ST.,MT
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
COILED TUBING, INJECTION DEPTH, GAS INJECTION RATE INSIDE DIAMETER COILED TUBING
DOI:
Abstract :