DESAIN PERENCANAAN APLIKASI SQUEEZE CEMENTING PADA SUMUR "TJ 029" LAPANGAN :HASBI" MENGGUNAKAN HYDRAULIC WORKOVER UNIT SNUBBING 150 K DENGAN METODE ARROW SET PACKER (ASP)

Categorie(s):
   TP, 2018
Author(s):
   QISRAH PUTRA HASBI, 1401199
Advisor:
Eltimeyansi Crisye Randanan, ST., M.Si
Boyke M. Kdafi, ST., MT
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
SQUEEZE CEMENTING, SNUBBING 150K, MASP
DOI:
Abstract :