OPTIMASI PRODUKSI PADA SUMUR "X-53" DI LAPANGAN "Y" MENGGUNAKAN PERMANENT COILED TUBING GAS LIFT
Categorie(s):
TP, 2019
Author(s):
AKBAR TANJUNG, 1401143
Advisor:
Ir. Yudiaryono, MT
Abdi Suprayitno, ST., M.Eng
Abdi Suprayitno, ST., M.Eng
ISSN/ISBN:
eISSN/eISBN:
Keyword(s):
RATE PRODUKSI, IPR, VLP DAN SIMULATOR
DOI:
Abstract :