ANALISA PERFORMA MATA BOR DI SECTION 12.25 DAN 8.5 PADA SUMUR "B-1" LAPANGAN "PCT" MENGGUNAKAN METODE COST PERR FOOT
Categorie(s):
TP, 2019
Author(s):
BAYU INDRIYADI PALONDONGAN, 1401166
Advisor:
Andi Jumardi, ST., MT
Andy Wijaya, S.Si., MT
Andy Wijaya, S.Si., MT
ISSN/ISBN:
eISSN/eISBN:
Keyword(s):
COST PER FOOT, MATA BOR, PEMBORAN
DOI:
Abstract :