ANALISIS KEBUTUHAN TENAGA KERJA PADA EQUIPMENT OVERHAUL TA GROUP ROTATING DENGAN MENGGUNAKAN METODE WISN (WROKLOAD INDICATOR STAFFING NEED) PADA PERUSAHAAN PT PETRO ALL BALIKPAPAN

Categorie(s):
   TP 2018
Author(s):
   ARDHY ABDILLAHH, 1301032
Advisor:
JAN FRIADI SINAGA, ST.,MT
BAMBANG SUGENG, ST.,MT
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
BEBAN KERJA, WISN, TURN ARROUND
DOI:
Abstract :