PENANGGULANGAN KICK PADA LUBANG SUMUR UKURAN 12 1/4 INCI MENGGUNAKAN PERHITUNGAN DRILLER METHOD PADA SUMUR IF-O26 LAPANGAN X

Categorie(s):
   TIEM, 2019
Author(s):
   IRVAND FADILLAH, 1502026
Advisor:
M. Saleh, ST., MT
Bambang Sugeng, ST., MT
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
Kick, Driller Method,ICP, KMW, FCP, Jadwal Pemompan
DOI:
Abstract :