OPTIMASI HEAT EXCHANGER E-2-02 A/B DENGAN MENAIKKAN FLOW RATE LONG RESIDUE PADA TUBE DAN MENAIKKAN TEMPERATURE MASUK SHORT RESIDUE PADA SHELL PLANT HVU II HCC PT. PERTAMINA RU V BALIKPAPAN

Categorie(s):
   TPM, 2016
Author(s):
   MIA AGUSTINA
Advisor:
BUSTAM SULAIMAN, SUBAGJO W
ISSN/ISBN:

eISSN/eISBN:

Keyword(s):
HEAT EXCHANGER, FLOW RATE, LONG RESIDUE, TUBE, SHORT RESIDUE
DOI:
Abstract :